Draft #27 - too specific with the church buildings, needs to be more abstract, can speak to development / buildings, but needs more of a management / leadership tone.
Draft #30 - Interesting composition, but needs more structure to it, more balance maybe?
MycroBurst permits you to submit unlimited designs with unlimited variations. However, if you show 2 or 3 different color versions of the same logo in one draft, please make sure that if that draft gets finalized, each color version is separated before final files are sent out.
BUSINESS CLARIFICATION - here is more about what we do.
Most Overlooked Considerations when Developing a New Building
- Too much / not enough architectural and engineering services.
- Owner has different expectations from the design team and construction team.
- Selection of a design and construction team, warm and fuzzies go a long way. Sometimes price isn't the most important thing.
- Method of Construction Delivery is one of the most important considerations on meeting cost and schedule requirements.
- Negotiating is usually the best method to get the best quality and most economic results.
- YOU are the Owner, YOU pay for everything. YOU are the one at risk. The GC and Architect are not in the business of risk.
- It's MUCH cheaper to figure out on paper than it is during construction. Schedule delays.
- The selection of the major building components, the largest cost of the building and typically one that the owner has the least involvement with.
- Length of time it takes to finalize financing.
- FFE (fixtures, furnishings and equipment) costs and scheduling.
- General Construction resources that the owner pays for that are not needed.
- Time required for a "soft opening" of the building, regardless of building type.
- The HVAC will be uncomfortable at first, it takes time to "tune" a space and balance it properly.
- InVision Advisors has the experience to understand all of these with your project and guarantee savings that exceed our fees.
Draft #5, x3mart, thank you for your submittals. Would the logo work without the Dream,Build,Execute? The overall logo is a bit "boney", does that make sense? While I think the concept of the sights is powerful, especially with some sort of embracing graphic (the curves), I think that this is a bit too liney, maybe more variation to the line weights / perhaps some shapes incorporated?
Draft #11, I like the logo, especially pertinent since I am based in Florida, but font seems a bit too casual, would there be a more formal font that could make the overall logo a bit more corporate?
Draft #12, Qanda, thank you for your submittals, I like the overall format with the exception to the "crown" shape in the skyline - could it be something else?
Draft #4, lighthouse is a bit too literal. I don't object to the overall format, but is there a more abstract symbol that could compliment the overall layout?
14 Commentaire récents
Porteur du Projet
Porteur du Projet
Porteur du Projet
Draft #30 - Interesting composition, but needs more structure to it, more balance maybe?
Porteur du Projet
Employé(e)
MycroBurst permits you to submit unlimited designs with unlimited variations. However, if you show 2 or 3 different color versions of the same logo in one draft, please make sure that if that draft gets finalized, each color version is separated before final files are sent out.
Thanks,
MB/LDG Team
Porteur du Projet
Porteur du Projet
Most Overlooked Considerations when Developing a New Building
- Too much / not enough architectural and engineering services.
- Owner has different expectations from the design team and construction team.
- Selection of a design and construction team, warm and fuzzies go a long way. Sometimes price isn't the most important thing.
- Method of Construction Delivery is one of the most important considerations on meeting cost and schedule requirements.
- Negotiating is usually the best method to get the best quality and most economic results.
- YOU are the Owner, YOU pay for everything. YOU are the one at risk. The GC and Architect are not in the business of risk.
- It's MUCH cheaper to figure out on paper than it is during construction. Schedule delays.
- The selection of the major building components, the largest cost of the building and typically one that the owner has the least involvement with.
- Length of time it takes to finalize financing.
- FFE (fixtures, furnishings and equipment) costs and scheduling.
- General Construction resources that the owner pays for that are not needed.
- Time required for a "soft opening" of the building, regardless of building type.
- The HVAC will be uncomfortable at first, it takes time to "tune" a space and balance it properly.
- InVision Advisors has the experience to understand all of these with your project and guarantee savings that exceed our fees.
Porteur du Projet
Porteur du Projet
Porteur du Projet
Porteur du Projet
Porteur du Projet
Porteur du Projet
Porteur du Projet