hey everyone, thank you for working so hard ...as of this post (unless) something totally different comes in... (or) changes are posted from previous work we requested, then we will be focusing on #143; #144; #126; #139....each of these has captured one or more elements of what we want to convey
all entries please add the following tag line or your take on the message for final review, we don't want to have to extend the contest, however it is an option. Thank you...be creative and bring your take to the tag line.....or atleast use this one for now.
if you don't already have a tag line can you pop one in just to bring a more finished look. We can make the line exact later just want to see them all as finished as possible
and any other designers who want to submit please do so asap.
okay after meeting with investors and board members, the current update of top 5 are #85; #95; #90; #5; #69
changes have been requested for most of the top 5
If anyone has anything new/or changes to other designs and want to put it out there please know we are meeting on and off daily and want to move this forward within the contest time frame 1 more day without extension.
Thanks and we look forward to changes and any new entries that are being worked on...
Thanks to all of you and your hard work, this is much harder than we thought,ha...
As of today/ with 2days to go/ we have the top 5 (#90; #69; #80; #85; #88)
If anyone wants to make changes, submit new designs, put personal touches, give input....please do so asap....
we are open to ideas that will really speak to the viewer and peak them about doing business "another way" .... the construction industry has a reputation of being un-organized, sloppy, un-reliable, and expensive.....we have worked very hard behind the scenes for several years to break out of that, and have proven ourselves different within the community, now we desire to bring it out to the public knowing we are confident to stand behind on our word, and deliver....
It is also the time where the company will promote outreach projects whereby each contract will contribute to a greater need...
kinda like the pebble in the water creates a ripple effect as far as the eye can see.
maybe we are likened to the pebble that causes the ripple effect in our industry....
its very clear that we have two teams reviewing desings of which are on opposite sides of the vision.....fun, fun....
is there anyone who can help bridge the gap?
top 5 are very outreach "beyond" the normal message, leaving room for questions....slight risk factor (this was the original intent to cause the viewer to catch the concept that there is more than construction going on)
however
the 2nd group of 5 are very literal and obvious,(safe)... fresh look but no need to think about it....so what seperates these from the next company 2 doors down? or the million company vans sporting logos?
need some design that will bridge the gap and help shift to one side or the other...
thanks for all the hard work, and many change requests.....
our favorites so far are incorporating the oak tree, and/or the globe....love the sense of global due to the fact that we are mission driven ....and outreach is our heart....thanks to all for helping us sort it all out
all the entries will be reviewed throughout the weekend but as a group on Monday.
Thank you everyone for helping us with this process.....we have a tight time frame to complete this process and many other services are needed to include typical letterhead stuff, but expanded work for web design and whole truck skins.
Draft # 22 Rocker, can you take the E back down to match the other font; leave the door knob, and then expand the globe somehow stretched out in the background of a transit type window vs the arch
25 Commentaire récents
Employé(e)
Porteur du Projet
Porteur du Projet
so unless something major happens we will continue to work on choosing the winning design between lotus or eatgon
thanks everyone.....
Porteur du Projet
can ea of you add
Ps.127:1
somewhere on the logo
thank you
and everyone likes the tag line
old or new we build from a higher point of view
can you make changes so we can confirm final winner...thanks
Employé(e)
Regards!
Porteur du Projet
Thank you
Porteur du Projet
"old or new we build from a higher point of view"
Porteur du Projet
please respond with changes if requested
and if there are any other entries/changes out there that anyone wants to make please submit...asap
Porteur du Projet
if you don't already have a tag line can you pop one in just to bring a more finished look. We can make the line exact later just want to see them all as finished as possible
and any other designers who want to submit please do so asap.
Porteur du Projet
#85; #95; #90; #5; #69
changes have been requested for most of the top 5
If anyone has anything new/or changes to other designs and want to put it out there please know we are meeting on and off daily and want to move this forward within the contest time frame 1 more day without extension.
Thanks and we look forward to changes and any new entries that are being worked on...
Porteur du Projet
#85; #88; #90; #69; #95
and #41 is still very sweet to us but maybe for another project....
Porteur du Projet
As of today/ with 2days to go/ we have the top 5 (#90; #69; #80; #85; #88)
If anyone wants to make changes, submit new designs, put personal touches, give input....please do so asap....
we are open to ideas that will really speak to the viewer and peak them about doing business "another way" .... the construction industry has a reputation of being un-organized, sloppy, un-reliable, and expensive.....we have worked very hard behind the scenes for several years to break out of that, and have proven ourselves different within the community, now we desire to bring it out to the public knowing we are confident to stand behind on our word, and deliver....
It is also the time where the company will promote outreach projects whereby each contract will contribute to a greater need...
kinda like the pebble in the water creates a ripple effect as far as the eye can see.
maybe we are likened to the pebble that causes the ripple effect in our industry....
hmmmmmmm might be something with that......
thanks
Porteur du Projet
its very clear that we have two teams reviewing desings of which are on opposite sides of the vision.....fun, fun....
is there anyone who can help bridge the gap?
top 5 are very outreach "beyond" the normal message, leaving room for questions....slight risk factor (this was the original intent to cause the viewer to catch the concept that there is more than construction going on)
however
the 2nd group of 5 are very literal and obvious,(safe)... fresh look but no need to think about it....so what seperates these from the next company 2 doors down? or the million company vans sporting logos?
need some design that will bridge the gap and help shift to one side or the other...
thanks for all the hard work, and many change requests.....
Porteur du Projet
Porteur du Projet
embracing the old....constructing the new
or
maintaining the old....building the new
Porteur du Projet
Porteur du Projet
all the entries will be reviewed throughout the weekend but as a group on Monday.
Thank you everyone for helping us with this process.....we have a tight time frame to complete this process and many other services are needed to include typical letterhead stuff, but expanded work for web design and whole truck skins.
Porteur du Projet
Porteur du Projet