Mycroburst.com - Home
English | Français | العربية

877-525-5646

Equipe commerciale: du lundi au samedi, de 13h00 à 17h00 CET
Assistance technique: du lundi au samedi, de 13h00 à 17h00 CET


Bref Conception

Pour le projet KCP LUNCH AND LEARNheld by Gamezone

Gagné

Modèle #6 Choisi en tant que gagnant

Des documents de marketing | Crée par Gamezone

  • Gains
    225,00 $ Garanti
  • Créations
    9
  • Fermer
  •  Gagnants
    1
    Plus d’info
     
     

Bref créative

 

  KCP LUNCH AND LEARN

 

  KC PIPE, LP LUNCH AND LEARN

 

 

 

  My company and another company is sponsoring a lunch and learn for an industry expert in OCTG Casing and String Design. We will be providing a speaker with an extensive resume and I would like that to be highlighted on the flyer. Along with time, date, event and RSVP instructions. I would like a picture of the speaker and the general design to be of oil and gas nature. There are two companies sponsoring this event and I would like to use both of our logos. I will provide those in PDF form.

 

  Energy

 

  This is potential and current customers in the Oil and Gas industry. These are materials purchasers and the luncheon is for them to learn some new techniques in string design and to be able to ask questions in an open forum. Lunch will also be provided.

 

  These are some general topics that will be discussed but maybe say something like "some of the things to be discussed by Mr. Urech....

Starting at 10 and going until 2

Very quick basic Pipe 101 – how it is made, ERW vs. SMLS
Inspections API requires – EMI, SEA, Weld line inspections
new API requirements like 7” coupling size & composite protectors
Plain End Hydrotesting vs. Screw on Hydrotesting. We have several customers that require a hydrotest after threading.
Ring & Plug on location vs. clean & visual
Q&T material vs. proprietary grades like I-80 & E-80
Heat treating process
Quality of domestic mills vs. import mills
New mills in Philippines, Vietnam, & Turkey – are these old Chinese mills? Why did we see so many failures in Chinese pipe?
Horizontal drilling, when you need a CDC thread
Will frac sand erode wall thickness? In horizontal wells at the bend.

 

Téléchargez le matériel du projet

 

KC_Pipe_logo_Converted__2__17703.pdf

 

Bowman_A__Urech_17704.pdf

 

tubular_group_17705.gif

comes off website: www.tubulargroup.com